AMECO secures repeat order from major US utility company

AMECO Portal Reclaimer for generating station, USA

After having successfully delivered and commissioned one Portal Reclaimer for LG&E at Trimble County Power Station, KY, in 2014, AMECO is currently commissioning a second Portal Reclaimer for LG&E at Bedford Generating Station, KY.

This very successful cooperation between the EPC, AMEC Foster Wheeler, and AMECO enabled a timely delivery for this Portal Reclaimer handling desulphurized gypsum.

This repeat order from a major utility company in the United States demonstrates AMECO’s recognized know-how for a gypsum handling solution. AMECO focuses on a robust design, using local manufacturers and on a user-friendly and mistakenproof software and interface.

During all the lifetime of the reclaimer, AMECO also provides preventive maintenance tools and an easy remote diagnostic.

Last but not least, we are aware that our customer operates in sensitive industries and AMECO is one step ahead of its competitors regarding machine safety and protection against external intrusions attempts.

AMECO – The Power of Know-How